EasyManua.ls Logo

Zephyr ZGS-12000-7 - Page 18

Zephyr ZGS-12000-7
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fixed Hoist Test Facility Operation and Maintenance Manual ZOM-12000-7 rev 0
Page 18 of 24
This manual contains proprietary information and is not to be copied or disclosed without written
permission from Zephyr International LLC. Copyright 2006-2008
Attach the plug from the Ground Power Cart to the receptacle provided.
o Attach the 220 V AC power
o Attach the ZGS-12201-1, ZGS-12202-1 and the ZGS-12203-1 cable
assemblies,
ZGS-12201-1 High Speed Hoist Test Stand Main Cable
3 phase breaker switch
220 VAC 50 Hz input power