EasyManua.ls Logo

Zephyr ZGS-12000-7 - Assembly of FHTF

Zephyr ZGS-12000-7
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fixed Hoist Test Facility Operation and Maintenance Manual ZOM-12000-7 rev 0
Page 7 of 24
This manual contains proprietary information and is not to be copied or disclosed without written
permission from Zephyr International LLC. Copyright 2006-2008
Assembly of FHTF:
o Unpack the crates and verify all the parts arrived in good condition.
o Use a forklift and lift the base weldment off the pallet and place it close to its
final position.
o Attach the base attachment angles to the I Beam using the labels to align each
bracket properly
Base Attachment Angles
I Beam