1
General Safety
IMPORTANT SAFETY INFORMATION
PRIOR TO INSTALLATION
• Make sure that the cold and hot water lines are turned off.
• Wrap all threaded connections with Teflon tape. Always wrap in a clockwise direction.
• Cover your drain to avoid losing parts.
• Do not disassemble the main system body, as it has been installed and commissioned
correctly and precisely before delivery to the factory.
• To keep the system from jamming, flush the water pipe before installation.
Operating conditions: Working pressure at 0.05-1.0 MPa (including cold and hot water
pressure) with applicable water temperature: 39.2°F - 194°F.
• If soldering the water connections when installing the system, remove the O-rings,
cartridges, and washers before applying any heat.
• Protect your eyes when cutting or soldering.
• Do not over tighten screws/nuts. Finger tighten, then use a wrench/screwdriver to
tighten the fixing screw/nut until snug.