EasyManuals Logo

3Com 4200G Installation Guide

3Com 4200G
4 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
3Com Switch 4200G
10G Interface Module
Installation Guide
1. XFP Interface Module
1.1 Appearance and front panel
Figure 1 Appearance of an XFP interface module
Figure 2 Front panel an XFP interface module
1.2 Installation
Step 1: Put on an ESD-preventive wrist strap and verify it is properly
grounded. Then remove the XFP interface module from the package.
Step 2: Loosen the filler panel mounting screws on the rear panel of the
switch with a screwdriver and remove the filler panel.
Step 3: Hold the fastening screws on the front panel of the XFP interface
module, and gently push the module in along the slot guide rail until the
module is in close contact with the switch.
Step 4: Tighten the fastening screws with a screwdriver to secure the XFP
interface module.

Other manuals for 3Com 4200G

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the 3Com 4200G and is the answer not in the manual?

3Com 4200G Specifications

General IconGeneral
Model4200G
Jumbo Frame SupportYes
ManageableYes
Uplink Ports4
ManagementWeb, SNMP, CLI
Power SupplyInternal
FeaturesVLAN, QoS, Link Aggregation, Spanning Tree
Dimensions44.0 x 32.0 x 4.4 cm
Ports48
LayerLayer 2/3
MAC Address Table Size16, 000 entries

Related product manuals