EasyManua.ls Logo

4tek MIRAGE - Compressor Startup and Leak Testing; Starting Procedure and Pressure Check

4tek MIRAGE
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
This manual is the property of . No part of it may be reproduced in any form.
MIRAGE Line Compressors Instruction Manual
3
5 - 02
Now start the compressor by turning (depending on the model, see page 2-02 - Fig 1 - 2)
the switch on the pressure switch (Fig. 1), except for the TOP model, on which the switch is
located on the front panel (Fig. 2).
2
4 5 6
In the fi lling cycle the compressor reaches 8.5
bar.
At this point, close the line valve (Fig. 3 - 4
- 5 - 6) for around 30 minutes to check for
possible internal leaks on the compressor.
Open the valve (Fig. 3 - 4 - 5 - 6), with the
chair or laboratory connected and with no
instruments operating, and check that the
pressure reading on the gauge remains
constant, thereby establishing the absence of
air leaks in the circuit.
1