EasyManua.ls Logo

4tek MIRAGE - Basic Compressor Operation; Initial Startup and Purging

4tek MIRAGE
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
This manual is the property of . No part of it may be reproduced in any form.
MIRAGE Line Compressors Instruction Manual
Basic operating rules
Once the equipment has been installed, follow the
prescriptions set down in the previous pages and plug in
the power cable, making sure the air receiver is empty by
opening the drain valve (Fig. 1 - 2 - 3 - 4).
Once the receiver has been purged, close the valve.
5 - 01
3
21
Operation