EasyManua.ls Logo

A&D AD-4405 - Installing an Option Board

A&D AD-4405
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AD-4405 Weighing Indicator Page 7
3.1.5. Installing an Option Board
This is the procedure for the data output board (OP-03, OP-05, OP-07 and OP-08).
Caution Do not remove any screws without the following step.
Step 1 Remove the power cord from the power outlet (mains) and other cables from the
indicator.
Step 2 Remove two screws from the RS-232C panel at rear panel.
Step 3 Remove the standard RS-232C panel and board from the indicator.
Step 4 Remove the cable from the standard RS-232C board.
Step 5 Connect the cable that was removed in step 4 to the new option board.
Please be careful to orientate the connector correctly.
Step 6 If the option board has an earth terminal (OP-05, OP-08), connect the earth cable
in the indicator to that terminal.
Step 7 Insert the option board into the indicator.
Step 8 Secure option board panel using two screws.
Step 9 Set the F-Function(s).
OP-07 : f30 1 (Analog output)
OP-08 : f37 if current loop output is used
3. Installation and Precautions

Table of Contents