EasyManua.ls Logo

ABB 10D1475 - Mounting Procedure

ABB 10D1475
10 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MOUNTING PROCEDURE
INSTALLATION OF 1/10 - 3/8 INCH METERS
Align flange adapter on meter
body, as shown below.
Install a gasket at meter inlet and
outlet, as applicable for meter
type. Observe flow direction arrow.
Insert meter with (with gaskets)
between pipe flanges.
Insert mounting studs through bolt
holes.
Thread nuts on mounting studs
(finger tight).
Press down on flange adapter to
force-spread studs, thereby cen-
tering meter in pipeline.
Use proper torque and tightening
sequence (i.e. 1-3-2-4) to maintain
even pressure distribution as
shown in the figure to the right.
MOUNTING
PROCEDURE
FIGURE 4. Meter Mounting Diagram, 1/10 - 3/8 in. Sizes
ABB
3 - 10
(1/10 - 3/8)
NOTE: Meter shown is Model 10D1476/1477
INSTALLATION INSTRUCTIONS
4

Related product manuals