EasyManua.ls Logo

ABB 5VHK 250 - User Manual

ABB 5VHK 250
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
IB
6.2
.
7.7
-
30
Installation
/
Maintenance
Instructions
Medium
-
Voltage
Vacuum
Power
Circuit
Breakers
Types
5
VHK
250
5
VHKX
250
1200
and
2000
Amperes
5000
volts
Models
20
and
21
ASMS
ABB
Power
Distribution
,
Inc
.
Circuit
Breaker
Division
ASHA
BROWN
BOVEF
Courtesy of NationalSwitchgear.com
Question and Answer IconNeed help?

Do you have a question about the ABB 5VHK 250 and is the answer not in the manual?

Summary

Introduction and Initial Handling

Receiving and Storage Procedures

Examine cartons for damage, file claims, and store circuit breakers properly upon receipt.

Circuit Breaker Installation

Procedures for installing circuit breakers, including inspection and component checks.

Vacuum Interrupter Examination

Examine vacuum interrupters for cracks and seal damage before installation.

Circuit Breaker Installation and Removal

Installing Front Cover

Steps to install the front cover assembly after inspection.

Installing Circuit Breaker into Compartment

Procedure for racking the circuit breaker into the switchgear compartment.

Manual Operation of Electrically Operated Models

Guidance for manually charging closing springs for bench tests or emergency operation.

Circuit Breaker Removal

Steps to remove the circuit breaker from the 'CONNECTED' position.

Maintenance, Adjustments, and Tests

General Maintenance Information

Overview of maintenance requirements, adjustments, and routine checks for circuit breakers.

D.C. Millivolt Drop Test

Procedure for testing the circuit breaker current circuit condition using a millivolt drop test.

Insulation Cleaning

Instructions for cleaning dirt, dust, or grease from current carrying structure and vacuum interrupters.

Circuit Breaker Operation and Timing

Contact Adjustment and Wipe Check

Steps for checking and adjusting contact wipe to ensure proper breaker operation.

Contact Air Gap Check

Procedure for checking the contact air gap to ensure proper breaker opening.

Contact Sequence Check

Ensuring all three poles touch within 2 milliseconds during closing speeds.

Closing and Opening Times and Speeds

Recommendations for checking breaker closing and opening times using specialized equipment.

Operating Mechanism Adjustments

Latch Engagement (Bite) Adjustment

Procedure for adjusting the latch engagement screw for proper operation.

Racking Mechanism Adjustment

Instructions for adjusting the racking mechanism if interlocked blocking members are mispositioned.

Control Device Overtravel Adjustment

Adjustment of the close latch rod release for proper operation and preventing closing.

Lubrication and Dielectric Testing

Lubrication Guidelines

Details on factory-applied lubricants and recommendations for maintenance.

Dielectric Tests

Recommended dielectric withstand tests for vacuum interrupters and primary/secondary circuits.

Electrical Characteristics and Operating Sequences

Electrical Operating Sequence Overview

General information on electrical operation, referring to schematic diagrams.

DC Closing Operating Sequence

Step-by-step sequence of operations for DC closing of the circuit breaker.

AC Closing Operating Sequence

Summary

Introduction and Initial Handling

Receiving and Storage Procedures

Examine cartons for damage, file claims, and store circuit breakers properly upon receipt.

Circuit Breaker Installation

Procedures for installing circuit breakers, including inspection and component checks.

Vacuum Interrupter Examination

Examine vacuum interrupters for cracks and seal damage before installation.

Circuit Breaker Installation and Removal

Installing Front Cover

Steps to install the front cover assembly after inspection.

Installing Circuit Breaker into Compartment

Procedure for racking the circuit breaker into the switchgear compartment.

Manual Operation of Electrically Operated Models

Guidance for manually charging closing springs for bench tests or emergency operation.

Circuit Breaker Removal

Steps to remove the circuit breaker from the 'CONNECTED' position.

Maintenance, Adjustments, and Tests

General Maintenance Information

Overview of maintenance requirements, adjustments, and routine checks for circuit breakers.

D.C. Millivolt Drop Test

Procedure for testing the circuit breaker current circuit condition using a millivolt drop test.

Insulation Cleaning

Instructions for cleaning dirt, dust, or grease from current carrying structure and vacuum interrupters.

Circuit Breaker Operation and Timing

Contact Adjustment and Wipe Check

Steps for checking and adjusting contact wipe to ensure proper breaker operation.

Contact Air Gap Check

Procedure for checking the contact air gap to ensure proper breaker opening.

Contact Sequence Check

Ensuring all three poles touch within 2 milliseconds during closing speeds.

Closing and Opening Times and Speeds

Recommendations for checking breaker closing and opening times using specialized equipment.

Operating Mechanism Adjustments

Latch Engagement (Bite) Adjustment

Procedure for adjusting the latch engagement screw for proper operation.

Racking Mechanism Adjustment

Instructions for adjusting the racking mechanism if interlocked blocking members are mispositioned.

Control Device Overtravel Adjustment

Adjustment of the close latch rod release for proper operation and preventing closing.

Lubrication and Dielectric Testing

Lubrication Guidelines

Details on factory-applied lubricants and recommendations for maintenance.

Dielectric Tests

Recommended dielectric withstand tests for vacuum interrupters and primary/secondary circuits.

Electrical Characteristics and Operating Sequences

Electrical Operating Sequence Overview

General information on electrical operation, referring to schematic diagrams.

DC Closing Operating Sequence

Step-by-step sequence of operations for DC closing of the circuit breaker.

AC Closing Operating Sequence

ABB 5VHK 250 Specifications

General IconGeneral
BrandABB
Model5VHK 250
CategoryCircuit breakers
LanguageEnglish

Related product manuals