Interblocco meccanico tra un interruttore Emax e un interruttore T7-T7M-X1
mMechanical interlock between an E ax circuit breaker and a T7-T7M-X1 circuit breaker
Mechanische Verriegelung zwischen einem Leistungsschalter Emax und einem Leistungsschalter T7-T7M-X1
Interverrouillage mécanique entre un disjoncteur Emax et un disjoncteur T7-T7M-X1
Enclavamiento mecánico entre un interruptor Emax y un interruptor T7-T7M-X1
DOC. N.° 1SDH000529R0663 - B2236
Emax - Tmax
- 6 6
1 - -
- 2 2
- 1 1
- 2 2
- 1 1
- 1 1
- 1 -
2 - -
2 2 2
- - 1
10 10 10
8 8 8
2 2 2
ESTRAIBILE
WITHDRAWABLE
AUSFAHRBAREN
DÉBROCHABLE
EXTRAÍBLE
FISSO FISSAGGIO PARETE
FIXED WALL-MOUNTED
FEST, WANDMONTAGE
FIXE, MONTAGE PAROI
FIJO, FIJACIÓN DE PARED
FISSO FISSAGGIO PAVIMENTO
FIXED FLOOR-MOUNTED
FEST, BODENMONTAGE
FIXE, MONTAGE SOL
FIJO, FIJACIÓN DE PISO
ESTRAIBILE
WITHDRAWABLE
AUSFAHRBAREN
DÉBROCHABLE
EXTRAÍBLE
FISSO FISSAGGIO PARETE
FIXED WALL-MOUNTED
FEST, WANDMONTAGE
FIXE, MONTAGE PAROI
FIJO, FIJACIÓN DE PARED
FISSO FISSAGGIO PAVIMENTO
FIXED FLOOR-MOUNTED
FEST, BODENMONTAGE
FIXE, MONTAGE SOL
FIJO, FIJACIÓN DE PISO
T7
T7M
X1
2
1
1
2
APERTO
OPEN
AUS-STELLUNG
OUVERT
ABIERTO
BIANCO
WHITE
WEISS
BLANC
BLANCO
T7-T7M-X1
Emax

Other manuals for ABB Emax

Question and Answer IconNeed help?

Do you have a question about the ABB Emax and is the answer not in the manual?

Summary

Adjustment Procedure

Insert Moving Parts

Insert moving parts into fixed parts for withdrawable versions.

Adjust Tie Rod H and J

Pull tie rod 'H' of X1-T7 upwards to bring tie rod 'J' of E1/E6 to 10 mm.

Adjust Tie Rod P and Q

Pull tie rod 'P' of E1/E6 downwards to bring tie rod 'Q' of X1-T7 to 10 mm.

Perform Final Checks

Perform opening/closing operations and check the 10 mm gap.

Mechanical Check Procedure

Check Breaker Interlock (A Closed, B Open)

Close breaker 'A' and ensure breaker 'B' cannot be closed.

Verify Breaker A Stays Closed

Reset breaker 'A' springs and verify it remains closed.

Check Breaker Interlock (B Closed, A Open)

Close breaker 'B' and ensure breaker 'A' cannot be closed.

Verify Breaker B Stays Closed

Reset breaker 'B' springs and verify it remains closed.

Repeat Test and Verify Adjustments

Repeat test thrice, check adjustments and tie-rod fastness.

Summary

Adjustment Procedure

Insert Moving Parts

Insert moving parts into fixed parts for withdrawable versions.

Adjust Tie Rod H and J

Pull tie rod 'H' of X1-T7 upwards to bring tie rod 'J' of E1/E6 to 10 mm.

Adjust Tie Rod P and Q

Pull tie rod 'P' of E1/E6 downwards to bring tie rod 'Q' of X1-T7 to 10 mm.

Perform Final Checks

Perform opening/closing operations and check the 10 mm gap.

Mechanical Check Procedure

Check Breaker Interlock (A Closed, B Open)

Close breaker 'A' and ensure breaker 'B' cannot be closed.

Verify Breaker A Stays Closed

Reset breaker 'A' springs and verify it remains closed.

Check Breaker Interlock (B Closed, A Open)

Close breaker 'B' and ensure breaker 'A' cannot be closed.

Verify Breaker B Stays Closed

Reset breaker 'B' springs and verify it remains closed.

Repeat Test and Verify Adjustments

Repeat test thrice, check adjustments and tie-rod fastness.

ABB Emax Specifications

General IconGeneral
Rated Current630 A to 6300 A
Number of Poles3 or 4
Frequency50/60 Hz
MountingFixed or withdrawable
StandardsIEC 60947-2
Trip UnitElectronic