Manual for Induction Motors and Generators
Commissioning Report - 128
3BFP 000 050 R0101 REV E
8 Test run (with load)
Checking schedule and information
9 Machine approval
Time Load Bearing temp. Bearing vibration levels Stator Stator winding temperature
D-end N-end D-end
mm/s
N-end
mm/s
Current Power
Factor
Excit.
Current
UVW
h:min %
ºC ºCrms rms Acos φ A ºC ºC ºC
0:00
Vibration spectrum attached:
Acceleration time: __________ s.
Cooling air temperature: Inlet: __________
ºC Outlet:__________ ºC
Cooling water temperature: Inlet: __________
ºC Outlet:__________ ºC
Comments:
Machine approved for use Date:
Commissioning done by:
Approved by:
no yes