12
ABB UPS PRODUCTS AND SOLUTIONS
7 Stabilizer bracket for
external batter module
3.2.4.2 External battery modules
1. Set up the extension plate as below and install
it on the UPS stabilizer bracket.
2. Install the UPS and EBM individually into the
stabilizer bracket.
3. Connect to the UPS with the battery power
cable (refer to rack position installation).
Note:
It is recommended that this unit be installed to
UPS’s righthand side.
If installing an additional unit, place it next to
the previous unit.
07