L OUT N L IN N L OUT N L IN N L OUT N L IN N
UPS 1 Output Breaker UPS 2 Output Breaker UPS 3 Output Breaker
Output Line Output Neutral
UPS 1 Input Breaker
Ground
Input Line Input Neutral
Ground
UPS 2 Input Breaker UPS 3 Input Breaker
18
ABB UPS PRODUCTS AND SOLUTIONS
How to install a new parallel UPS system:
1. Before installing a new parallel UPS system,
prepare the input/output wires, breakers and
a main maintenance mechanical switch or
static switch.
2. Independent battery packs for each UPS.
3. Remove the cover plate from the parallel
connection port on the UPS, connect each
UPS one by one with a parallel connection cable
and make sure the cable is screwed in tightly.
4. Install the cable locker to protect the parallel
cable for each UPS.
17 Parallel cable
connection
18 Parallel connection
cable locker
19 Parallel system
wiring diagram
5. Connect the input and output wires and make
sure all the breakers are turned off.