EasyManuals Logo

ABB TPL69-A Series User Manual

ABB TPL69-A Series
139 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #57 background imageLoading...
Page #57 background image
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30
5 Maintenance / 5.3 Cleaning the compressor during operation
© Copyright 2018 . All rights reserved. HZTL2481_EN Revision C May 2018
u Push the valve activator (Y) against the spring and hold it for 10...15
seconds until the entire volume of water has been injected.
u After cleaning, wait at least 5 minutes to allow turbocharger to dry.
NOTICE
If the cleaning operation is not satisfactory, it may be repeated up to
two times.
If the cleaning result is still not satisfactory after three attempts and
the engine values are also unsatisfactory, we recommend that you have
the turbocharger inspected and cleaned by an official ABB Turbochar-
ging Service Station.
Cleaning parameters per turbocharger compressor
Product Engine load Contents of cleaning
medium vessel
[dm
3
]
TPL69-A 50…85% 0.4
TPL73-A 1.0
TPL77-A 1.0
Page 55 / 136

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB TPL69-A Series and is the answer not in the manual?

ABB TPL69-A Series Specifications

General IconGeneral
BrandABB
ModelTPL69-A Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals