EasyManua.ls Logo

ABB UBBRT - User Manual

ABB UBBRT
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
On-load tap-changers, type UBB
Installation and commissioning guide
1ZSE 5492-118 en, Rev. 4
Question and Answer IconNeed help?

Do you have a question about the ABB UBBRT and is the answer not in the manual?

ABB UBBRT Specifications

General IconGeneral
BrandABB
ModelUBBRT
CategoryIndustrial Equipment
LanguageEnglish

Summary

2. Receiving

2.2 Inspection upon receiving

Procedure for checking for transport damage and verifying delivery.

3. Installation in the transformer

3.1 Cover-mounting

Details the process of mounting the tap-changer through the transformer cover, including terminal connections.

3.2 Yoke-mounting

Details yoke-mounting, including measurement before/after drying and mounting to cover.

4. Drying

5. Final assembly

5.1 Mounting of the motor-drive mechanism

Instructions for mounting the motor-drive mechanism and aligning its position indicator.

5.3 Mounting of external drive shafts

Covers mounting of horizontal and vertical drive shafts and couplings.

6. Pressure relay

6.1 General

Overview of the pressure relay and its function in tripping circuit breakers.

6.2 Installation

Steps for installing the pressure relay on the tap-changer.

6.3 Checking at commissioning of the transformer

Procedure for testing the pressure relay during transformer commissioning.

7. Oil filling

7.1 Filling methods and restrictions

Discusses methods and limitations for oil filling, including vacuum and atmospheric pressure.

7.4 Correct oil level

Guidelines for achieving the correct oil level in the indicator based on temperature.

7.5 Restoring the gas cushion

Procedure for restoring the gas cushion after oil filling for pressure relay safety.

8. Electrical connection and testing

10. Commissioning

Related product manuals