EasyManua.ls Logo

ABB UBBRT - Page 20

ABB UBBRT
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
1ZSE 5492-118 en, Rev. 4
fm_00209
4. Remove the lifting eyes when the on-load tap-changer is in right position on the ”yoke-
fork”.
5. The on-load tap-changer and the transformer is now ready for drying. Follow the in-
structions in chapter 4.
3 Installation in the transformer
Approx. 15 mm
Fig. 10.

Related product manuals