- 106 -
000696DG
7 - Operation
A notication will conrm that the wizard is completed.
• After the wizard is completed, the message “Initializing...Please Wait” is
displayed on the inverter display. Regardless of the input voltage value,
the inverter displays various messages and changes the behaviour of the
“Power” and “Alarm” LEDs
06
:
Input voltage Message on display LED Status Description
Vin < Vstart Waiting Sun
Power = Flashing
Alarm = OFF
The input voltage is not sufcient to enable connection
to the grid.
Vin > Vstart Missing Grid
Power = Flashing
Alarm = ON
The input voltage is sufcient to enable connection to the
grid: the inverter waits for the grid voltage to be present
to make the parallel connection.
The inverter is powered SOLELY by the voltage generated by the photovoltaic generator: the
presence of grid voltage alone is NOT SUFFICIENT for the inverter to switch on.
• With the inverter in the “Missing Grid” status, close the AC switch down
-
stream of the inverter thus applying the grid voltage to the inverter: the
inverter checks the grid voltage, measures the insulation resistance of
the photovoltaic eld with respect to ground and performs other auto-dia-
gnostic checks. During the preliminary checks on the parallel connection
with the grid, the “Power” LED keeps ashing, the
“Alarm” and “GFI”
LEDs
are off.
• During the check on the grid voltage and the measurement of the in-
sulation resistance, the voltage, grid frequency and insulation resistance
values measured by the inverter are displayed. The inverter ONLY cre-
ates a parallel connection with the grid if the grid and insulation resist-
ance parameters fall within the ranges foreseen by current regulations.
• If the outcome of the preliminary checks on the grid parallel is positive,
the inverter connects to the grid and starts to export power to the grid. The
“Power” LED remains xed on while the “Alarm” and “GFI” LEDs are off.
To address any problems that may occur during the initial stages of operation of the system
and to ensure the inverter remains fully functional, you are advised to check for any rmware
updates in the download area of the website www.abb.com/solarinverters or at https://regi
-
stration.abbsolarinverters.com (instructions for registering on the website and updating the
rmware are given in this manual).