EasyManua.ls Logo

ABB UNO-DM-1.2-TL-PLUS - STEP 3 - Date, Time and Time zone

ABB UNO-DM-1.2-TL-PLUS
61 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 103 -
000696DG
7 - Operation
STEP 3 - Date, Time and Time zone
Set the Date, Time and Time zone (The inverter will propo-
se these elds when available).
When it’s not possible for the inverter to detect the time
protocol, these elds have to be manually entered.
Click on “Next” button to proceed to the next stage of the
conguration wizard.

Other manuals for ABB UNO-DM-1.2-TL-PLUS

Related product manuals