EasyManua.ls Logo

Ablerex ATS-16A - Page 16

Ablerex ATS-16A
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
3.4.2. ATS HOT
SWAP Series Installation Steps:
1. Open package and note the packaging layers. Keep the box and
packaging material in case further transportation is required.
2. Check for damage to the ATS from shipping and handling. Please
contact your local distributor if the product is damaged.
3. Check the input power cable/socket and output socket of the delivered
ATS model with your order.
4. Affix the backplate (Figure 1) Affix the ATS onto the frame of the
Maintenance Box (Figure 2) .
5. Insert the load plugs into the ATS sockets labeled "OUTPUT" and
spreading them as evenly as possible.Then enter the product's rated
operating power connection
6. Check that the total load does not exceed ATS specifications (e.g.
voltage, current).
7. Supply power to the ATS (Figure 3),. The ATS automatically boots up
after 1 second and supplies the capacity power to the connected load.
8. Finally, the ATS host body with screws to the rack (Figure 4), to
complete the installation
F
ig
ure 1 Figure 2
Figure 3 Figure 4