EasyManua.ls Logo

Acer Aspire 4310 - Disassembly Process

Acer Aspire 4310
164 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 49
Disassembly Process
The disassembly process is divided into the following stages:
T External module disassembly
T Main unit disassembly
T LCD module disassembly
The flowcharts provided in the succeeding disassembly sections illustrate the entire disassembly sequence.
Observe the order of the sequence to avoid damage to any of the hardware components. For example, if you
want to remove the mainboard, you must first remove the keyboard, then disassemble the inside assembly
frame in that order.
Main Screw List
Item Screw Color Part No.
A M2 x L4 (torque 1.6) Black 86.00F24.724
M2 x L4 (torque 3.0)
B M3 x L4 Silver 86.9A554.4R0
C M2 x L6 Black 86.00F58.726
D M2 x L2.5 Silver 86.00F22.722
E M2 x L4 86.9A552.3R0
F M2.5 x L8 Black 86.00E34.738
G M2.5 x L6 86.00E33.736
H M2 x L3 Silver 86.00C07.220
I M2 x L2.5 Silver 86.9A552.6R0

Table of Contents

Other manuals for Acer Aspire 4310

Related product manuals