EasyManua.ls Logo

Acer AT1921 - Page 28

Acer AT1921
61 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHECKING THE FOAM AND PUT IT TO
THE PRODUCTION LINE.
CHECKING THE SHIELDING AND
STICK 2*PCS FOAM.
PUT THE FLOW CARD TO THE
BOARD.
SCAN THE FLOW CARD AND CODE OF
P/B INTO THE TMS SYSTEM.
INSERT THE JUMP CABLE INTO THE
P/B AS LEFT SHOW.
CONNECT THE JUMP CABLE AND P/B
WITH WHITE GOOEY
MARK THE LOCATION WITH COLOR
PEN AS LEFT SHOW.
PUT IT TO THE PRODUCTION LINE.
CHECKING THE M/B AND LVDS
CABLE, AND INSERT THE LVDS
CABLE INTO THE JOINT OF M/B.
INSERT THE M/B-P/B CABLE INTO
THE JOINT OF M/B AND P/B.
PUT THE CONNECTED M/B AND P/B
TO THE SHIELDING, THEN PUT IT TO
PRODUCTION LINE.
Assembly process

Other manuals for Acer AT1921

Related product manuals