Service and Maintenance 5-33
Function Board Installation
Prerequisite:
Battery Removal on page 3-46
1. Connect the function board cable connector (colored side up) to the function board connector.
Figure 3:52. Connecting the Function Board Cable
2. Secure the protective tape to cover the function board connector.
Figure 3:53. Securing the Protective Tape
3. Install the battery (see Battery Installation on page 3-48).