INSTALLATION CHECKLIST
ELECTRICAL SYSTEM
Electrical connections tight? YES NO
Line voltage polarity correct? YES NO
Rated Voltage:
L1-L2 Voltage:
Has the thermostat been calibrated? YES NO
Is the thermostat level? YES NO
Is the heat anticipator setting correct? YES NO
REFRIGERATION SYSTEM
Was unit given 24 hr warm up period
for crankcase heaters (if applicable)?
YES NO
Ambient Temp (° F):
Discharge Line Temp (° F):
Stage-1 Liquid Pressure (high side):
Stage-1 Suction Pressure (low side):
FILTER SYSTEM
Filter(s) secured in place? YES NO
Filter(s) clean? YES NO
10331420
(Replaces 10270500)
INSTALLER: PLEASE LEAVE THESE INSTRUCTIONS WITH THE OWNER.
INSTALLATION ADDRESS:
CITY: STATE:
UNIT MODEL #:
UNIT SERIAL #:
Unit Installed Minimum clearances
per Figure 1 (page 4)?
YES NO
INSTALLER NAME:
CITY: STATE:
Has the owner’s information been
reviewed with the customer?
YES NO
Has the Literature Package been left
with the unit?
YES NO