EasyManua.ls Logo

ADT 967 - Page 16

ADT 967
16 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting Operation
Loading Screen
Tape bar(0%-100%)
Current tape left (%)
Tape % headline
Note: If the current tape left is under 5% of the initial length, then the Tape % headlinewill blink.
3. To continue with the mounting operation, follow the Mounting operationsection, at the 967 full manual.

Related product manuals