EasyManua.ls Logo

Aerco B+03 - User Manual

Aerco B+03
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
AERCO International, Inc. 100 Oritani Dr. Blauvelt, New York 10913 Phone: 800-526-0288
OMM-0063_0D
HE-110
USER MANUAL
Revised: 11/28/2018
Water Wizard
1B+ II
Water Heaters
SW1B+II Packaged Water Heater with
Pneumatically Controlled Valve (CXT-P)
Installation, Operation, and Maintenance
Covers all 1B+ II models
including units with
pneumatically controlled valve
(Type CXT-P) or with an
Electronic Control System (ECS)
and electronically controlled
valve (CXT-E):
B+03
B+04
B+05
B+06
B+07
B+08
B+09
B+10
B+11
B+12
B+13
B+14
B+15
Note: Number indicates number of
heating coils used (3 to 15).
SB-2006-02: ECS Retrofit Instructions
AC-105: Electronic Controls System (ECS) Manual
AC-103: Pneumatic Temperature Controller Manual

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Aerco B+03 and is the answer not in the manual?

Summary

Chapter 3. Installation

3.1. Installing the Water Wizard

Step-by-step instructions for physically installing the water heater unit.

Chapter 4. Principle of Operation

4.1. Heat Exchanger Operation with Pneumatic Control

Details the operational process for units with pneumatic temperature control.

4.2. Heat Exchanger Operation with Electronic Control System (ECS)

Explains the operational principles for units utilizing an Electronic Control System.

Chapter 5. Operating Procedures

Chapter 6. Routine Maintenance

6.1. Draining the Heater

Provides instructions for the periodic blowdown process to remove accumulated solids.

Chapter 7. Troubleshooting

Chapter 8. Corrective Maintenance

Chapter 9. De-Scaling by Thermal Shock Method

Chapter 10. Maintenance Disassembly

10.1. Tools and Equipment

Lists common and special tools required for disassembly and maintenance, including wrenches, hoists, and specialized tools like coil spacing tools.

10.2. Isolating the Heater

Steps to safely disconnect the heater from all energy sources.

10.3. Disconnecting the Heater from the Facility

Instructions for disconnecting the heater from facility piping and wiring.

Chapter 12. Maintenance Reassembly

12.8 Startup Procedure

Steps to follow for starting up the heater after maintenance.

Summary

Chapter 3. Installation

3.1. Installing the Water Wizard

Step-by-step instructions for physically installing the water heater unit.

Chapter 4. Principle of Operation

4.1. Heat Exchanger Operation with Pneumatic Control

Details the operational process for units with pneumatic temperature control.

4.2. Heat Exchanger Operation with Electronic Control System (ECS)

Explains the operational principles for units utilizing an Electronic Control System.

Chapter 5. Operating Procedures

Chapter 6. Routine Maintenance

6.1. Draining the Heater

Provides instructions for the periodic blowdown process to remove accumulated solids.

Chapter 7. Troubleshooting

Chapter 8. Corrective Maintenance

Chapter 9. De-Scaling by Thermal Shock Method

Chapter 10. Maintenance Disassembly

10.1. Tools and Equipment

Lists common and special tools required for disassembly and maintenance, including wrenches, hoists, and specialized tools like coil spacing tools.

10.2. Isolating the Heater

Steps to safely disconnect the heater from all energy sources.

10.3. Disconnecting the Heater from the Facility

Instructions for disconnecting the heater from facility piping and wiring.

Chapter 12. Maintenance Reassembly

12.8 Startup Procedure

Steps to follow for starting up the heater after maintenance.

Aerco B+03 Specifications

General IconGeneral
BrandAerco
ModelB+03
CategoryHeater
LanguageEnglish

Related product manuals