Installation and Operation Manual
On-Grid PV Inverter

Questions and Answers:

Afore BNT020KTL Specifications

General IconGeneral
Max. DC Voltage1100 V
MPPT Voltage Range200-1000 V
Number of MPPTs2
AC Voltage Range310 - 480 V
THDI< 3%
AC Grid Frequency50 / 60 Hz
Max. Efficiency98.6%
DC ConnectionMC4
Protection DegreeIP65
Weight32 kg
Nominal AC Power20000 W
Max. AC Power22000 W
Nominal AC Voltage400 V
Power Factor0.8 leading - 0.8 lagging
Operating Temperature Range-25°C to +60°C

Summary

Safety & Symbols

Installation

Installation Steps

Outlines the sequential process for installing the PV inverter.

Electrical Connection

PV Connection

Details the procedure and requirements for connecting PV strings.

Grid Connection

Describes how to connect the inverter to the AC grid.

Operation

Startup Setting

Guides through the initial configuration process after installation.

Parameter Setting

Details how to adjust and configure inverter operational parameters.

Commissioning

Commissioning Procedures

Lists steps to follow before and during system startup.

Shut Down & Restart

Maintenance & Troubleshooting

Fault Code and Troubleshooting List

Provides error codes and corrective actions.