EasyManuals Logo

Agilent Technologies N1913a Installation Guide

Agilent Technologies N1913a
59 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
Getting Started 1
N1913/1914A Installation Guide 9
3 Turn the meter on and confirm the background LED is green.
4 The power meter start-up will take approximately 25 seconds. After this routine, you
should see one of the following displays...
5 The power meter is now ready for use.
Dual Channel
Single Channel
NOTE
If the meter has been stored in extremely cold conditions, beyond its normal operating
range, the display may require a few minutes to warm up and operate normally.

Other manuals for Agilent Technologies N1913a

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies N1913a and is the answer not in the manual?

Agilent Technologies N1913a Specifications

General IconGeneral
BrandAgilent Technologies
ModelN1913a
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals