Do you have a question about the AirSep visionaire and is the answer not in the manual?
Brand | AirSep |
---|---|
Model | visionaire |
Category | Air Compressor |
Language | English |
Details provider responsibilities for handling, check-out, patient instruction, and O2 concentration checks.
Explains safety guidelines (WARNING, CAUTION, NOTE) and common symbols/abbreviations used in the manual.
Lists technical specifications including oxygen concentration, accuracy, power requirements, and operating conditions.
Explains the working principle of the VisionAire concentrator, from air intake to oxygen output.
Outlines the post-manufacturing operational check to ensure unit integrity after shipping or handling.
Describes the VisionAire's alarm system, covering intermittent alarms for power failure, low oxygen, pressure, and temperature.
Details the procedure for testing oxygen concentration output and verifying it meets specified levels.
Provides essential patient and provider instructions, emphasizing safe operation and user responsibilities.
Covers maintenance responsibilities, noting the VisionAire's low-maintenance design.
Introduces main components designed for easy access and repair of the VisionAire unit.
Provides instructions for removing the front and back panels for access to internal components.
Explains the compressor's function, output, sound level, and replacement procedures.
Describes the five two-way solenoid valves controlling air/oxygen flow and their maintenance-free operation.
Explains sieve beds with molecular sieve for oxygen concentration and their replacement, noting moisture sensitivity.
Describes the cabinet fan's role in cooling internal components and its replacement procedure.
Details the function of the main circuit board and its replacement procedure.
Explains how to check and set the product regulator for controlling maximum oxygen output flow.
Provides instructions for removing and installing the unit's circuit breaker.
Details the procedure for removing and installing the unit's main power switch.
Instructions for replacing the dual timer hour meter on specific models.
Provides steps for replacing the flow meter, noting precautions for units with O2 monitors.
Details the procedure for replacing the unit's power cord, including strain relief and ferrite ring.
Instructions for replacing the circuit board for the optional oxygen monitor system.
Provides steps for removing and installing the mixing tank.
Details the procedure for replacing the exhaust muffler assembly.
Instructions for replacing the unit's casters, requiring base separation.
Provides steps for replacing the entire roller base assembly.
Describes the air outlet option and how to check/set its pressure regulator.
Details a diagnostic test to check operating pressure for troubleshooting low oxygen concentration or service needs.
Provides general steps for isolating and resolving common malfunctions before using the troubleshooting chart.
A detailed chart listing problems, probable causes, and solutions for diagnosing and repairing the VisionAire unit.
Lists necessary tools and equipment for servicing and troubleshooting the VisionAire unit.