EasyManua.ls Logo

Aito 16 User Manual

Aito 16
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
FI
Made by NARVI Oy Finland
EN
Aito 16 / 20 / 24 / 16 VS / 20 VS / 24 VS
Installation, user and maintenance instructions
version 1.1

Other manuals for Aito 16

Question and Answer IconNeed help?

Do you have a question about the Aito 16 and is the answer not in the manual?

Aito 16 Specifications

General IconGeneral
BrandAito
Model16
CategoryPlumbing Product
LanguageEnglish

Summary

Technical Data

Before You Install the Sauna Heater

Steam Room

Requirements for steam room construction and heater selection based on room size and material.

Substrate

Floor load capacity requirements and installation base for concrete or combustible floors.

Safety Clearances

Minimum distances from heater to combustible materials and protective screen options.

Smoke Flue

Requirements for smoke flue class, draft, diameter, and connection.

Ventilation

Ensuring sufficient ventilation and air circulation in the steam room.

Installation and Preheating of the Sauna Heater

Preheating

Procedure for initial heating to remove protective agents, including water tank checks.

Regulation of the Height

Adjusting the sauna heater legs for leveling and height.

Connection with the Smoke Flue

Guidelines for connecting the heater to the smoke flue, ensuring proper sealing.

Changing of the Opening Direction of the Firebox Door

Instructions for reversing the firebox door hinge.

Installation of the Faucet

Procedure for installing the faucet on models with a water tank.

Sauna Heater Stones

Recommendations for stone type, preparation, and stacking for optimal performance.

Using the Sauna Heater

Firewood

Types of wood to use, prohibited materials, and proper firewood preparation.

Heating

Procedure for heating, regulating power with the ash drawer, and safety precautions.

Steam Water

Requirements for domestic water quality and warnings against using unsuitable water.

Removing the Ashes

Instructions for safely emptying the ash drawer before each heating session.

Maintenance of the Sauna Heater

Routine maintenance including cleaning, stone rearrangement, and chimney sweeping.

Disposal

Proper procedure for disposing of the sauna heater.

Soot Fire

Frequently Asked Questions

Warranty