6
OWNER’S MANUAL
ASSEMBLY INSTRUCTIONS
Find a space that provides a at surface and large enough area to inate the kayak
properly. Make sure that there are no protruding objects that may damage or puncture
the inatable.
Remove the kayak from packaging and completely unroll in order to inate.
Make sure the bladder ring is securely fastened on the side tubes, oor and the Boston
valves are securely fastened to the ring plate.
Unscrew the top of the Boston valve, inset pump hose and inate the side tubes to 2.0 PSI.
DO NOT OVER INFLATE. When complete, screw top of Boston valve back on.
1
2
3