EasyManua.ls Logo

Aladdin ALL200 - Step 9: Shim and Adjust for Plumb Cable; Step 10: Fasten ALL200 to Joists

Aladdin ALL200
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP 9
Shim and adjust ALL200 so that winch cable hangs plumb through center of hole in top contact plate on
ceiling box. See Diagram E. Look up at ceiling box from oor level to verify cable is plumb.
https://youtu.be/wpEWV0C0VCM
Never install the ALL200 where the cable is not plumb through the center of the ceiling box. is could
interfere with the automatic shuto system and could cause the chandelier to fall, which could cause
death, personal injury, and/or property damage.
Wood Screws
Washers
STEP 10
Fasten ALL200 to oor joists using wood screws (part A) and washers (part B) included in parts bag. See
Diagram F.
Never install the ALL200 without properly fastening it to the oor joists. is could interfere with
the automatic shuto system and could cause the chandelier to fall, which could cause death, personal
injury, and/or property damage.
Conrm winch cable
hangs plumb through
center of hole in
top contact plate on
ceiling box.
Diagram E
Diagram F
View from Floor Level