EasyManua.ls Logo

Allied Telesis AT-TQ2403 - Unpacking the Access Point; Antennas Installation; Figure 2: Location of the Antenna Connectors

Allied Telesis AT-TQ2403
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14 AT-TQ2403 - IEEE 802.11abgh, Dual Radio, Enterprise Wireless Access Point - Installation Guide
Unpacking the Access Point
To unpack the AT-TQ2403 IEEE 802.11abgh, Dual Radio, Enterprise Wireless Access Point perform the
following procedure:
1. Remove all components from the shipping package.
Note: Store the packing material in a safe location. You must use the original shipping material
if you need to return the unit to Allied Telesis.
2.
3.
1.
2.
Place the access point on a secure, level surface.
Ensure that the following hardware components are included in your access point package. If any item
is missing or damaged, contact your Allied Telesis sales representative for assistance.
Package Contents
One AT-TQ2403 IEEE 802.11abgh, Dual Radio, Enterprise Wireless Access Point
Two antennas
One wall mount kit containing two wall anchors and two screws
One AC adapter
One RJ45 cable
Four rubber feet
One magnet kit containing four magnets and four screws
One CD with KickStart utility
This installation guide
Antennas Installation
To install the antennas, perform the following procedure:
Remove the antennas from their package.
Locate the antenna connectors in the back of the
AT-TQ2403 IEEE 802.11abgh, Dual Radio, Enterprise
Wireless Access Point
, as shown in Figure 2.
Figure 2: Location of the Antenna Connectors
3. Screw antennas to antenna connectors, as shown in Figure 3.

Table of Contents

Other manuals for Allied Telesis AT-TQ2403

Related product manuals