EasyManua.ls Logo

Alpha InTec2 20SE - Page 6

Alpha InTec2 20SE
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
A + B = Head available to the system with by-pass closed.
B = Head available to the system by-pass opened.
Flow rate (l/h)
200 600 1000 1400800 1200
16004000
0
1
2
3
4
5
6
7
Head (m water)
A
B
Speed 5
Speed 9
Flow rate (l/h)
200 600 1000 1400800 1200
16004000
0
10
20
30
40
50
60
70
Pump electrical consumption (W)
C
D
Speed 5
Speed 9
Fig. 2.1
Fig. 2.2
2.4.1 Available Pump Head
2.4.2 Pump Power Consumption
C + D = Pump power consumption with by-pass opened.
D = Pump power consumption with by-pass closed.
Alpha InTec² 20SE and 30SE - Technical Data
Downloaded From www.Gas101.Co.Uk

Related product manuals