EasyManua.ls Logo

Alpha InTec2 30CE - BENCHMARK COMMISSIONING and SERVICING; Benchmark Requirements; 12 OPTIONAL BOILER CONTROLS (if fitted); Available Alpha Controls

Alpha InTec2 30CE
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
Alpha InTec² 26CE, 30CE and 35CE
12 OPTIONAL BOILER CONTROLS (if fitted)
There is a range of controls available from Alpha to operate your boiler. In addition to the items listed below the Alpha InTec²
boilers are compatible with most controls available on the market. However to get the most comfort and efficiency from your
boiler we recommend the Alpha Climatic controls with enhanced remote boiler functions and efficiency control.
Please refer to the instructions provided with the controls for further information on their setting and use.
Available Alpha controls:
Alpha Easy-Stat wireless programmable room thermostat ........................................................................Part No. 7.2000050
24hr mechanical heating clock (boiler mounted) ........................................................................................Part No. 6.1000201
7 day digital heating clock (boiler mounted) ...............................................................................................Part No. 6.1000210
Alpha Comfort 7 day wireless programmable room thermostat (boiler mounted receiver) .........................Part No. 3.022141
Alpha Climatic wired programmable boiler energy manager .....................................................................Part No. 3.022144
Alpha Climatic wireless programmable boiler energy manager (boiler mounted receiver) .........................Part No. 3.022143
External weather compensation probe .......................................................................................................Part No. 3.022383
Optional boiler controlled condensate trace heating kit ..............................................................................Part No. 6.5500000
11 BENCHMARK COMMISSIONING and SERVICING
It is a requirement that the boiler is installed and commissioned to the manufacturers instructions and the data fields on the
commissioning checklist completed in full.
To instigate the boiler guarantee the boiler needs to be registered with the manufacturer within one month of the installation.
To maintain the boiler guarantee it is essential that the boiler is serviced annually by a Gas Safe registered engineer who has
been trained on the boiler installed. The service details should be recorded on the Benchmark Service Interval Record and
left with the householder.

Related product manuals