Do you have a question about the Alstom MX3IPG2A and is the answer not in the manual?
Compares voltage/current ratio, triggers timers.
Handles overcurrent with tstart/trip timers, lockable by digital input.
Manages undervoltage with timer, lockable by digital input.
Manages overvoltage with timer, lockable by digital input.
Features direct undervoltage with tstart/trip timers, lockable.
Features direct overvoltage with tstart/trip timers, lockable.
Stores two setting groups (main/spare), programmable locally/remotely.
Automatic diagnostic checks upon power-on and during operation.
Six relays for various functions, including diagnostics.
Twelve LEDs indicate status, with dedicated and configurable functions.
Three optoisolated inputs for protection functions, programmable.
Associating timers with optoisolated inputs for extended control.
Tracks partial/total trips for thresholds, range 0-9999.
Records last 8 events with details like date, time, and measured values.
Displays real-time values of resistance, voltage, and current.
Enables testing of LEDs, display unit, and output relays.
Assigns a unique code for device identification.
Supports display in four languages: Italian, English, French, Spanish.
Configures LCD display features, including backlight.
Methods to inhibit operation or deconfigure via network.
Details on serial communication via LONWORKS bus.
Covers serial communication using RS485 and MODBUS protocols.
Records system data for detailed fault analysis.
Monitors tripping coil integrity using digital inputs.
Describes the LCD display, keyboard, and key functions for user interaction.
The primary menu for navigating device information and settings.
Interface for modifying device parameters and configurations.
Provides options for testing device functions and components.
Precautions for handling sensitive electronics to prevent ESD damage.
Guidelines for inspecting, accepting, and storing the device properly.
Instructions for physical installation and wiring of the device.
Essential safety rules to follow during equipment testing and startup.
Verification of equipment ratings against system specifications.
Procedures for final testing and calibration of the X2/IPG2A attachment.