Do you have a question about the Altec DL Series and is the answer not in the manual?
Attach pressure gauge to the quick disconnect in the return line or pilot drain port.
Energize pilot system at idle, record tank pressure, and then move gauge to pilot disconnect.
Energize pilot system and check if pressure gauge indicates within the calculated range.
Disengage hydraulics, turn off engine, disconnect gauge, and replace cover.
Loosen jam nut, turn adjusting screw to set pressure, and tighten jam nut.
Test pressure at pilot quick disconnect and repeat adjustment until within range.
Replace cap, disengage PTO, turn off engine, and secure unit.
Warm hydraulic oil to 120-130°F using IR thermometer for accurate CADI calibration.
Warm oil for digger units by operating Digger Dig; stow digger when oil reaches temperature.
Warm oil for non-digger units by operating Winch Raise/Lower; proceed when oil reaches temperature.
Connect the CADI unit to the connection socket using its cable.
Position boom at 10-30 degrees above horizontal for calibration of all functions.
Set low speed/standard switch to Standard and operate engine at full RPM for calibration.
Adjust MX and TH values for each function, starting with MX to initiate movement.
Record final TH setting and return MX setting to its original value.
Repeat steps 5 and 6 for each direction of each boom, winch, and digger function.
Engage hydraulics, operate all functions to check for leaks and proper operation.
Stow the unit, retract outriggers, disengage hydraulics, and return to service.