EasyManua.ls Logo

Alto-Shaam Vector VMC-H3 - Page 37

Alto-Shaam Vector VMC-H3
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Vecto r H® S eries Operat ors M anual M N-46 2 95 Rev 7 6/22
37
Continued from previous page
8. Install the ground wire f.
Leave an extra loop g so that current-carrying conductors become taut
before the ground wire if the cord is accidentally pulled. Follow applicable
regulations.
Tighten the cord grip sealing nut onto the supply cord.
9. Re-install the main disconnect switch.
10. Re-install the mounting bracket.
11. Re-install the top cover.
Continued on next page
NOTE: The equipotential-bonding terminal is located at
the bottom rear of the oven.
VMC-TS-002875
f
g
VMC-TS-007997

Table of Contents

Other manuals for Alto-Shaam Vector VMC-H3

Related product manuals