9. Calibration 
This section presents the procedures required to calibrate the power supply.  It is recommended that 
calibration should be performed at 12-month intervals, or following service if subassemblies are replaced.  
The procedures are performed using SCPI commands through the remote digital interface using either the 
Sequoia/Tahoe Virtual Panels GUI program or a communications program such as HyperTerminal.  For 
details pertaining to operation through the remote digital interface, refer to the Sequoia Series 
Programming Manual, M447353-01 Tahoe Series Programming Manual P/N M445374-01 for more details. 
9.1 Calibration Equipment 
Table 9-1 presents the equipment required to conduct the calibration. 
Equipment  Model 
Power Analyzer  Tektronix, Model PA3000, or equivalent 
Digital Phase Meter  Krohn-Hite, Model 6620, or equivalent 
DVM  Fluke, 8508A, or equivalent 
Function Generator  Keysight, Model 33210A, or equivalent 
Differential Probe  Tektronix, Model P5202A, or equivalent 
Load Bank  Resistive loads resistors at power levels per model rating 
Computer Controller 
Remote communications program through LAN, USB, or RS-232C 
Table 9-1. Calibration Equipment 
9.2  Source Mode Calibration Procedures 
9.2.1 Preparation for Calibration 
 
 
WARNING! 
Hazardous voltages exist at the rear of the power source.  Care must be 
taken to avoid contact with the AC input and AC/DC output terminals.  
Only authorized personnel should perform these procedures. 
 
Only technically trained personnel, who understand the operation of the power source, and are capable 
of taking accurate readings and following the procedure steps, should perform calibration.  The 
calibration procedures require precision instrumentation to measure voltage and current; when 
substituting for the recommended test equipment, ensure that the accuracy is adequate so that 
excessive error is not incurred, compared to the specifications of the parameters that are to be 
calibrated.
 To set up the alignment procedures, perform the following initial steps: 
1.  Disconnect AC mains power when making setup connections. 
2.  Connect the test equipment and loads to the output and control inputs of the power source. 
3.  Connect the digital voltmeter to the output of the power source. 
4.  Allow a 30-minute warm-up period for the power source and test equipment before conducting 
the calibration procedure.