EasyManua.ls Logo

Ametek SEQUOIA Series - Page 324

Ametek SEQUOIA Series
332 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Sequoia / Tahoe Series User Manual California Instruments
M447352-01 REV-A 301
CURR:REF RPV
INST:COUP NONE
5. Perform the synchronization procedure section 9.3.2 and enable the output of Sequoia unit using
command OUTP 1.
6. Enter the calibration password with the SCPI command, CAL:PASS “5000”.
7. DC Offset alignment, low-range AC output (166 VAC):
8. Send the SCPI command, INST:NSEL 1, to select Phase-A.
9. Perform the DC offset alignment with the SCPI command, CAL:MEAS:EXT:OFFS:DC 0, with the
output off and the external analog input at 0 VDC. Send the SCPI query command, *OPC?, to
determine when this alignment step has been completed; the query will return a 1 to indicate
completion. Ensure alignment has been completed (query returns a 1) before continuing.
10. Send the SCPI command, INST:NSEL 2, and repeat Step-9 to align Phase-B.
11. Send the SCPI command, INST:NSEL 3, and repeat Step-9 to align Phase-C.
12. AC Gain alignment, low-range AC output (166 VAC):
13. Send the SCPI command, INST:NSEL 1, to select Phase-A.
14. Apply an external programming DC voltage of 10.0 VDC, ± 0.005 V.
15. Measure the output current of Phase A with an external meter (Power Analyzer), and verify the
measured output current is 100% of full-scale current ±2% FSC.
16. If not Send the command CAL:SOUR:EXT:FSC < numerical value> . to adjust the output current
by reducing or increasing the numerical value. (Where numeric value can be up to 0 to 4095).
17. Send the SCPI command, INST:NSEL 2, and repeat Step-14 and Step-16 to align Phase-B.
18. Send the SCPI command, INST:NSEL 3, and repeat Step-14 and Step-16 to align Phase-C.
19. ADC-RMS Full-Scale alignment, high-range AC output (166 VAC):
20. Send the SCPI command, INST:NSEL 1, to select Phase-A.
21. Apply an external programming DC voltage of 10.0 VDC, ± 0.005 V.
22. Perform the ADC RMS gain alignment with the SCPI command, CAL:MEAS:EXT:FSC <100% of
Full-Scale Current>. Send the SCPI query command, *OPC?, to determine when this alignment
step has been completed; the query will return a 1 to indicate completion. Ensure alignment has
been completed (query returns a 1) before continuing. Verify the measurement with the SCPI
command, MEAS:CURR:EXT?, and ensure that the returned output current is 100% of full-scale
current ±1A.
23. Send the SCPI command, INST:NSEL 2, and repeat Step-21 and Step-22 to align Phase-B.
24. Send the SCPI command, INST:NSEL 3, and repeat Step-21 and Step-22 to align Phase-C.

Other manuals for Ametek SEQUOIA Series

Related product manuals