6
CDN HSS-2
2. UNPACKING, STORAGE AND TRANSPORT
2.1. General
Save all packing materials! They will be needed in order to safely package the equipment for calibration service
or repair.
Packaging materials
■ Carton: Cardboard
■ Padding: CFC-freepolystyrenefoam
■ Plasticbags: Polyethylene
■ Avoid the risk of condensation!
If a large temperature difference has occurred, allow time for the temperature to stabilize. This may take
several hours.
2.2. Storage and transport
■ Do not stack, either packaged or unpacked.
■ Do not stand on end; arrows on the packaging must always point upwards.
■ Protect from dampness, heat, cold and rain.
■ Do not throw.
■ Do not sit or stand on the instrument and packaging.
2.3. Unpacking
■ Is the packaging damaged? If YES
☎
transportation company
■ Areallthepackagespresentandcorrect? IfNO
☎
transportation company
■ Open the packaging, remove the accessories.
■ Grip the instrument at the sides and lift it from the packaging.
■ Are the instrument or accessories damaged? If YES
☎
transportation company
■ Arethecontentsofthepackagecomplete? IfNO
☎
Teseq sales office
■ Keep the instruction manual with the instrument.
■ Keep the packaging.
2.4. Scope of delivery
■ CDNHSS-2
■ 8 Jumper (4 mm safety banana)
■ Operating manual