2. Concrete must be in good condition and must be of test strength 3,000psi (210kg/cm²)
minimum.
3. Floors must be level and no cracks.
C. POWER SUPPLY
The electrical source must be 2.2KW minimum. The source cable size must be 2.5mm²
and in good condition of contacting with floor.
III. STEPS OF INSTALLATION
A. Check the parts before assembly
1. Packaged lift and Hydraulic Power Unit (See Fig. 4).
2. Open the outer packing carefully, check the parts according to the shipment list. (See Fig.
5)
.