9
In-wall installation
Making good the wall
Preparing the wall panel
The wall may be a new build or you could
have opened a cavity in an existing wall
to install the ALF120. In either case it is
now necessary to build/re-build the wall
to complete the installation.
Cut the section of wall board that will•
cover the ALF120.
Offer up the cut wall panel in the•
position where it will cover the
ALF120.
Mark up the position of the centre line•
of the ALF120.