EasyManua.ls Logo

AMOT 2230C - Page 18

AMOT 2230C
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Maintenance
Rev 2 – May 06 OMM223000015
CAUTION
To prevent damage, do not exceed the maximum temperature of the
Valve. Refer to the Technical Data, Section 6.
6 Apply the inlet pressure of 4 bar (60 psi) and slowly heat the liquid in the
container until the Valve trips.
7 Note the thermometer reading and ensure that it indicates the correct
setpoint.
Note
The Valve starts to bleed control pressure at 1 to 2° C (2 to 4° F) below the
setpoint.
8 Allow the Valve to cool and ensure that it closes when the temperature
falls below the setpoint.
9 If the “VENT” port leaks in the ‘cold’ condition or the setpoint requires
adjustment, return to AMOT at the address shown on the back cover of
this manual.

Related product manuals