EasyManua.ls Logo

Amrotec MiB-9 - Installation, Handling & Setting up; Unpacking List; Choosing a Location; Handling the Machine

Amrotec MiB-9
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
1 Installation, Handling & Setting up
Unpacking List
1. MIB-9 Counter 1 Unit
2. Bill Guide 2 pcs.
3. AC Power Code 1 pc.
4. MIB-9 User's Manual 1 pc.
5. Serial Printer Cable 1 pc.
Choosing a Location
To ensure trouble-free operation of your machine, place it on a flat, stable surface near your workstation.
Do not place your machine:
In direct sunlight.
Near heat sources or air conditioners.
In dusty or dirty environments.
Handling the Machine
When handling or moving the machine, do not lift with grasping the Reject Pocket. The picture shows how to lift the
machine correctly. Please refer to the pictures on the next page.

Other manuals for Amrotec MiB-9

Related product manuals