EasyManua.ls Logo

Aprilaire 5000 - Component Inspection for Issues

Aprilaire 5000
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TROUBLE SHOOTING (Continued)
6. Inspect components to ensure the following:
a. All components must be dry.
b. The ionizer frame-grounding clip must be in contact with
the control electrode. See Figure 1.
c. The conductive rubber strip must be in contact with the
conductive-coated tips of the media. See Figure 2.
d. The nine ionizing wires must be clean, straight, and hooked
onto the bus bar at one end and the ionizer frame at the
other. See Figure 1.
9
Handle
Ionizer
Wires
Inner Housing
Ionizer Frame
Grounding Clip
Control Electrode
Bus Bar
FIGURE 1

Other manuals for Aprilaire 5000

Related product manuals