PREPARING THE TREATMENT
Quick reference guide
USE
Used to scroll data
or edit values
Sets data to zero
Confirms access
or change to data
Quits function
or changes to data
ONLY enabled jobs are displayed
Job selection
02) 90 l/ha * ISO015 Green
>06) 240 l/ha ISO04 Red
Reset all data?
>No
Yes
Job selection
1
Active job
*
Selected job
>
Tank Filling
2
Tank capacity
Advanced Setup/
Tank/
Capacity: 3000 l
Liquid in tank:
after filling enter the level of liquid
contained in the tank
If the filling flow meter is connected,
the display will also show the filling status.
ATTENTION! Maximum level reached
Stop the filling pump:
you have reached the maximum tank capacity
Selected setting
>
Tank
Filling up : 3000 l
> Level : 1540 l
Filled quantity : 0 l
Main ON Log OFF
21.0 bar 425 rpm 725 l
1
Manual treatment control
Turn on the section valves required
Drive to the start of the field
2
3
Set the main switch to ON
Run the treatment
4
5
Use the control valve switch
to adjust the desired quantity
6
Enable manual operation
1
Man.
Man.
2
Automatic treatment control
Enable automatic operation
Turn on the section valves required
Drive to the start of the field
Set the main switch to ON
Run the treatment
Use the control valve switch
to temporarily modify the metering
2
3
4
5
6
1
Main ON Log OFF
21.0 bar 425 rpm 725 l
90 l/ha
90l/ha
The computer keeps
the set distribution value constant