34
Installation
13.0 Gas Connections
Section 4.0Section 6.6
All gas connections must be
checked for gas leaks.
CAUTION:
Natural Gas Pressure Settings:
ELEVATION INPUT RATING
Propane Pressure Settings:
ELEVATION INPUT RATING
13.1 Clocking Procedure
(for high altitude derating)
IMPORTANT: THE INPUT RATING SHOULD ALWAYS BE CHECKED WHEN FIRST FIRING THIS APPLIANCE.
Note:
Rough Calculation Equation:
3600
X
3
BTU
3
hr