27
Other types of equipment
Remove the upper connector
(2 bolts, 13 mm spanner).
1.2
Remove the lower connector
(2 bolts, 13 mm spanner).
1.2
10.5 Removal of a leading" pole (example in a longitudinal lay-out)
Take all necessary
precautions.
BEWARE OF PARTS IN MOTION !
When being removed, the
pole must be handled with
care (no shocks to the araldite).
In the case of a circuit
breaker having connections
ensured by 2 tie-rods, only remove
the pin and the clamp from the pole
being replaced.
1 - Remove the clamp from the
tie rod of the control
mechanism.
Never dismantle the pin
supporting this clamp.
1
2 - Release the tie-rod. It
remains connected to the
operating lever of the control
mechanism.
2