EasyManua.ls Logo

ARI D-040 - Periodic Maintenance; 5.1. Preparation; 5.2. First Stage Maintenance

ARI D-040
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
IOM D-040
5. PERIODIC MAINTENANCE
Please note that the periodic maintenance of the air valve is an integral part of the proper pipeline
maintenance regime; it should be maintained at least once a year in accordance with the quality and
composition of the fluid in the system.
Important: Before performing any work on the air valve, make sure that all workers on site are familiar
with the safety instructions section of this document and with all the relevant local and general safety
instructions, standards and work regulations.
5.1. Preparation
5.1.1. Required tools and materials:
Small bowl with kitchen type liquid soap
4.5mm roll pin punch
5.2. First Stage Maintenance
Perform when a small leak is detected from the Discharge Outlet Elbow and clogging or debris in the sealing
mechanism is suspected
5.2.1. Releasing Pressure
Shut the isolating valve located on the riser under the air valve
Carefully release the pressure and drain the air valve
Important: Discard liquid to comply with local regulations

Related product manuals