Overview of the main steps required to install the switch.
Crucial safety warnings and guidelines for installation and operation.
Criteria for choosing a suitable installation location, focusing on ventilation.
Guidelines to prevent damage from static discharge during handling.
Procedures for mounting 1RU switches in a two-post rack.
Procedures for mounting 1RU switches in a four-post rack.
Instructions for properly grounding the switch for safety.
Details on connecting AC and DC power cables to the switch.
Step-by-step guide for configuring the switch manually after initial boot.